This third party logistics facility incorporates a unique sawtooth design to maximize its building area. Along with 51 overhead dock doors the building also has a drive-through dock to accommodate smaller vehicles with hydronic ice melt. With 481,222 SF of warehouse space and an additional 20,056 SF office component, this facility also contains 14,000 SF of cooler storage.
MTE Logistix
Location
Edmonton, Alberta
Client
MTE Logistix Inc.
Consultant
Stantec Architecture Ltd.
Gross area
501,278 SF

